Preview · Full plan released under NDA
Preview — Page 03

Working Together

How the engagement runs, what your team ends up owning, and what the full plan contains

The Engagement Model

Mostly remote, with on-site time at the points where it is needed

2 days
on site

Hands-on training for your team

Two full days with your engineers, QA and tech lead, covering agentic ways of working and the tooling itself. Your team runs the tools on your own codebase with us present, so the practice starts inside the team rather than being handed over later.

Occasional
visits

On site at the key points

Stage gates, the pilot kick-off and the rollout handover. These are the points where decisions are made and where being present in person is useful. Dates agreed jointly and in advance.

Remote
throughout

Everything else runs remote

Agent build, pipeline work, reviews and working sessions all run remotely.

How We Support Your Team

All of it aimed at the same thing: the programme runs without us afterwards

📚

Working sessions, not slides

  • Every engineer runs a real change through the fleet with one of us alongside
  • Sessions are recorded and become onboarding material for future hires
  • All of it on your own codebase, never an example project
  • These run remotely through the rollout, on top of the two on-site days
🔧

Internal agent maintainers

  • Two or three of your engineers learn to write and change agent definitions
  • Agents are software and need maintainers, and those maintainers should work for you
  • Trained during the programme, not briefed at the end of it
📋

Runbooks you keep

  • Onboarding a new module
  • Adding a reference dataset
  • Diagnosing an agent that starts producing poor output
  • Disabling an agent quickly
  • Updating the written conventions when one changes
👥

A steward for every module

  • Each module gets a named steward with a written remit
  • Keep the written context current, review changes, and never be the sole author
  • Stewards meet monthly to share what the agents keep getting wrong

The engagement ends at week 14

By then the duties, the runbooks and the named owners all sit inside Nerve Solutions, and there is no ongoing dependency on us. That is the design, not a limitation: a programme that still needs the consultants in month six has not been handed over. The full plan sets out the operating cadence your team runs from week 13 onward, including what to watch for and how to respond to each signal.

Contents of the Full Plan

Eighteen sections, seven of them stage playbooks. Released once the agreement is signed

🔒Executive Overview
🔒How a Change Flows
🔒The Agent Fleet
🔒Role Transformation
🔒Production-Ready Code
🔒QA & Test Readiness
🔒Build to UAT
🔒Measurement & ROI
🔒Stage 0 — Foundation
🔒Stage 1 — Knowledge Base
🔒Stage 2 — Safety Net
🔒Stage 3 — Pilot
🔒Stage 4 — Measure & Refine
🔒Stage 5 — Rollout
🔒Stage 6 — Continuous
🔒Risk Analysis
🔒Timeline & Next Steps
🔒Assumptions & Open Questions

Each of those is a full section rather than a heading: the agent specifications, the gate criteria, the measurement set, the stage-by-stage deliverables, the risk register with its stop conditions, and the staffing the schedule assumes. These are released once the agreement is signed.

Next step

If this approach works for you, the next step is the engagement agreement. On signature the full plan is released in the same format as this preview, and week one starts with the baseline measurement.